Agenda – Llanddewi Brefi Community Council – Annual Meeting 09/05/2022

PDF Download PDF

ANNUAL MEETING OF THE COUNCIL 

The Annual Meeting of the Council will be held on Monday 9 May 2022 at 7.00pm at the Community Centre. Members of the public wishing to attend remotely should email web@llanddewibrefi.org in advance to request a link to the meeting.

AGENDA: 

  1. To elect a Chairman for the Council Year 2022/23. 
  2. To elect a Vice-Chairman for the Council Year 2022/23. 
  3. To receive the Chairman’s Declaration of Acceptance of Office. 
  4. To receive Councillors’ Declaration of Acceptance of Office. 
  5. To Confirm the Minutes of the Annual Meeting of the Council held on 17 May 2021 (Attached).
  6. To receive the Annual report of the Council for the year 2021/22 (To be e-mailed to members prior to the meeting). 
  7. To receive declarations of personal and personal/prejudicial interests. 
  8. To appoint Committees and Working Parties: 
    1. Hall Management Committee.
      (All members of the Council to be in membership with the Chairman and Vice-Chairman of the Council holding these respective positions).  
    1. Biodiversity Working Party (Duty under s6. Environment (Wales) Act 2016).
  9. Appointment of Representatives. 
    1. One Voice Wales Area Committee (Currently Councillors E Kincaid and E James). 
  10. Appointment of Trustees.
    1. Fuel Allotments charity (Charity number: 500142).
  11. Rates of Remuneration. To review the following: 
    1. Hourly rate payable to the Burial Clerk. 
    1. Chairman’s allowance.
    1. Members allowances.
  12. To Review the schedule of Burial Fees and Payments.
  13. To Appoint an Internal Auditor for 2022/23. 
  14. To Review the Fixed Assets Register (Register attached). 
  15. To Review arrangements for public participation at full Community Council meetings (in accordance with Section 48 of the Local Government and Elections (Wales) Act 2021).
  16. To Review and adopt Standing Orders and Financial Regulations. 
  17. To determine whether a review of the Council’s complaints procedure is required. 
  18. To Review the Council’s Risk Assessment Register (2021/22 Risk Assessment Register attached).
  19. To Review the Council’s Insurance Arrangements.
  20. To Review the Council’s subscription to One Voice Wales.
  21. To Review the Council’s procedures and adopt policies in connection with its obligations under the Freedom of Information Act 2000 and the Data Protection Act 2018 (GDPR). 
  22. To Review and adopt policies for Safeguarding and Volunteers.  
  23. To Determine the time and place of ordinary meetings of the full council up to and including the next annual meeting of full council.

Agenda – Llanddewi Brefi Community Council – 25/04/2022

PDF Download PDF

A meeting of the Community Council will be held on Monday 25th April 2022 at 7:30pm in the Community Centre.

Members of the public wishing to attend remotely should email web@llanddewibrefi.org in advance to request a link to the meeting.

AGENDA

  1. To receive apologies.
  2. Personal Matters
  3. Declarations of interest.
  4. To confirm the minutes of the meeting held on 28 March 2022.
  5. Matters arising from the minutes.
  6. To note the Results of Uncontested Elections
  7. To confirm continuing temporary arrangements for the carrying out of the duties of the Clerk as Proper Officer and Responsible Financial Officer.
  8. To consider draft statutory guidance relating to the Annual Report for the financial year 2021-2022.
  9. To consider GDPR and Safeguarding policies.
  10. To approve proposals for the old school bell project.
  11. To review and sign updated contract for Cynnal y Cardi LEADER Grant. 
  12. Financial report.
    1. To approve the bank reconciliation for the period ending 31 March 2022. 
    2. Authorisation of payments.
      1. Reimbursement of payments made by members.
      2. Payments in connection with LEADER grant project.
      3. Planning application fees – old school bell project.
    3. Recurring payments.
      1. BT – Hall telephone & broadband. 
    4. Payments received.
    5. To approve a payment claim in connection with LEADER grant project.
    6. To consider proposals for internet banking and electronic payment.
  13. Correspondence (copies forwarded to members).
    1. Confirmation of precept 2022-23 Precept and 2020/21 Cemetery Grant.
    2. Information regarding Code of Conduct and Declaration of acceptance of office.
    3. Email from CAVO – Woodland Wellbeing Activities.
    4. Wales Community Food Distribution – Information flyer.
    5. Arts Council Wales – Noson Allan.
    6. Email from resident – Dog walking around Community Centre.
    7. Hywel Dda CHC Newsletter.
    8. Pryor & Rickett Silviculture – request to give presentation on woodland creation.
  14. To receive a report from the PCSO.
  15. To consider repairs to fencing between Pynfarch and Ash Street/ B4343.
  16. County Councillor’s report on matters arising from Ceredigion 
  17. Planning applications
    1. To note the following approvals:
      1. A220085 – Installation of a 25m mast; Land at Garn Felen, Adjacent to Forestry Track Bryn Du, Tregaron
  18. To receive a report from the Village Hall and Recreation Grounds committee.
  19. A.O.B.
  20. Date of next meeting. 

Minutes – Llanddewi Brefi Community Council – 03/03/2022

PDF Download PDF

926

Minutes of the meeting held on Thursday 3rd March 2022 at 7:00pm on Zoom.

Draft minutes are published in accordance with the requirements of the Local Government and Elections (Wales) Act 2021, and are subject to approval at the next ordinary meeting of the Community Council.

Present:
Councillors: Eirwen James (Chair), Caryl Jones (vice chair), Emmanuel Kincaid, Lynet Pugh, Dafydd Lloyd Jones, Rhodri Evans, Pat Parry, Enfys Hatcher Davies, Beth Anthony, John Lloyd Griffiths.

Also in attendance: James Grey, Senior Development Officer, Belltown Power UK (BPUK), Bristol based Renewable Energy Company; Robert Fellows, Director of Quattro (assisting BPUK with the community consultation); Paul Hewitt, CEO Belltown Power UK.

1. Apologies
Ben Lake MP.
2. Declarations of interest
None
3. Belltown Power – proposal for the Waun Maenllwyd Wind Farm
Paul Hewitt introduced Belltown Power UK – the company behind the Waun Maenllwyd Wind Energy Hub. Powerpoint presentation is available. The project involves land South East of Llanddewi Brefi. Whereas BPUK has been responsible for constructing subsidised wind hubs in the UK and USA it now concentrates on unsubsidised wind hubs.
BPUK is responsible for 200 megawatts in Wales, England and Scotland. The presentation included Community, Development Values, the Environment and Education including front-loaded community benefits with reference to the Tir Gwynt Project template
• Community benefits – owning part of the project. Giving away 1% of the project to the community as an incentive.
• Shares in the windfarm. Reference made to selling 4% of the windfarm at cost – with the possibility of selling up to 15%.
• Net gain
• Education – using the assets to create educational materials for local schools. Site visits. Inspiring the next generation to take up STEM subjects.

James Grey introduced the Waun Maenllwyd Wind Energy Hub project. The accompanying Powerpoint presentation will be made available. The site, 3km southeast of Llanddewi Brefi, is intended to generate up to 25.2 MW; a 33kV grid connection has already been secured into Lampeter substation.

927

The proposal is for 5-7 turbines at 200m tall, possibly 7 x 3.5 MW, or 5-6 x 5 MW
Dependent on the outcome of surveys. Bird, Forestry, Visual impact, and Aviation Surveys need to be explored.
Part of the site is within an area pre-assessed in 2014 by Welsh Government as being suitable for large scale onshore development
Orange line on the presentation map defines the possible access options from the South through Pumsaint, using a mix of new and existing forestry tracks. Some underground cabling is intended down towards the South West.
Infrastructure projects are decided by the Planning Inspectorate but Ceredigion County Council has an important role to play as a statutory consultee (Belltown Power UK were due to make a presentation to Ben Lake, MP for Ceredigion and Elin Jones, MS the next day).
The first stage would be to apply for planning permission to erect a meteorological
mast to assess the generation potential of the site. This would be followed by a pre-application consultation. The company hope for a decision by the end of 2024.

The final page of the presentation gave a brief background of the BPUK Key Leadership Team in Wales. The Llanddewi Brefi Community Council was invited to keep in touch. Regular scheduled calls were offered in order to receive comments and queries and to hear reports of progress.

Questions and comments.
• Visual impact – only indicative crude drawings available at the moment. Nothing available to share at this point. The present tallest wind turbines in Wales to date are 149.9m. Scoping in South Wales for turbines to the height of 250m.
• Area of benefit – divided between affected areas. Reference was made to the 6km area of benefit in the Brechfa Wind Hub. Views are welcome. No answer to share to date.
• Proposed access – Pumsaint. Keyholing.
• Mention was made of the proposed clearing and felling licence relating to the neighbouring forestry to the North West. Discussion as to whether or not a buffer would be left. JH BPUK was not aware of the felling licence nor the new forestry roads for wider access to facilitate felling and clearing. Comment was made by JH that wind flow should not be affected.
• Concern for transportation. Traffic management assessment needed. Considered plan of limited number of turbines. Narrow roads to be considered but access intended through roads to the South and the A roads.
• Reference to the open land and moorland surrounded by the forestry. 1 or 2 turbines may be located on the moorland.

928

• Expansion – would need further planning permission. Always a chance of expansion. Lack of infrastructure and limited grid capacity may make it less likely to expand. BPUK have acquired the last 25 megawatts of the capacity. New infrastructure would be needed before expansion could be considered.
• Life expectation of the Wind Hub 30-35 years. Area of Community benefit – No answer yet. Community Energy Wales help panel set up. Between 5% and 12% returns are known. The at-cost template could offer greater returns. As a marker, attention was drawn to considering Llanddewi Brefi as the most influential stakeholder on any future Benefit Decision Panel, as the community most affected.
• Make-up of panel – Robert Fellows reported that the membership of the Benefit Decision Panel varies.
Some have a BPUK right to veto in order to ensure that the decisions integrate with company guidelines. James Grey added that of late, Welsh Government’s focus has taken a more corporate aspect and concentrates more on the post windfarm legacy and supporting climate change issues on a wider level. In the past this was less so.
• Aviation survey – includes the MoD.
• After the 30-35 years. Decommissioning bond in place. Applying for new planning is a possibility, otherwise the planning authority requires decommissioning and returning the area to its original state.
• Contingency plan – Special Purpose Vehicle is put in place if the company comes to a halt. This is highly unlikely as once the turbines are up, they run and generate electricity, but if the company ceased, the decommissioning bond will be put in place. The project is a stand-alone Wind Hub and should not be influenced by other ventures. However, planning restrictions would require removal of the turbines if for any reason the company ceased.
• Forestry to the North West – Stellar Asset Management Ltd used to own the land to the North West. May now be owned by Foresight UK.
• Ownership of Waun Maenllwyd.
It was established that the project belongs to Belltown Power UK/ UK Wind Ltd.
The land however is in 3 parcels.
i) Commercial Forestry – Gresham House Forestry on behalf of their own trusts and private landowners.
ii) 2 private landowners managed by Gresham House.
iii) 2 local landowners.
Names are available on the land registry.
• The project is a joint venture, with the Foresight Group as a funding partner of Belltown Power UK.

929

4. Review and approve submission of the CAVO Small Grants application.
Cllr Rhodri Evans has been in contact with CAVO and they are still willing to accept applications for the Ceredigion Small Grants. Some progress has been made with the application, and costs have been established for a keyboard/piano/organ for use in the Hall. It was agreed that Cllrs Rhodri Evans, Eirwen James and Enfys Hatcher-Davies should complete and submit the application as soon as possible. The grant award is for a maximum of £2,000, without any requirement for match funding, but it was decided to limit the scope of the application to the items scheduled.
It was considered whether or not the piano/keyboard should be made available for hire. If not, it was suggested that maybe another group would be better suited to make the application. Since the application needs to be made by a constituted group with 2 signatories it was decided that the Community Council should make the application. The hiring conditions for community use to be considered by the next hall meeting in April, including liability and insurance.

5. Internal Auditor – terms of engagement and responsibilities.
The template letter with terms of engagement and audit plan considered at the last meeting was revised on the basis of the good practice guidance published by the Wales Audit Office (Internal Audit Arrangements at Town and Community Councils in Wales – January 2019), and shared with councillors prior to the meeting.

As Cllr Emmanuel Kincaid had been appointed as RFO, it was decided to approach Gareth Jones to ask if he would consider the role of Internal Auditor, and to forward the letter of appointment. The proposed remuneration is an annual fixed sum of £100, and the appointment will continue subject to annual confirmation at a meeting of the Council.

6. Financial report
a. The bank reconciliation report for the period ending 28 February 2022 was presented by the RFO, approved by members, and signed by the Chair.

Bank balances at 18/02/2022:
Current A/c £100.00
Reserve A/c £1,611.69
Reserve A/c £10,616.41
b. The following payments were authorised:
i. Purchase of fire alarms and signage for the Community Centre; Safelincs. Ltd. (Local Government (Miscellaneous Provisions) Act 1976 s.19) – £293.08. A pro-forma invoice was authorised to be paid by bank transfer.
ii. Burials – Beddfeini Hafod (Local Authorities Cemetery Order 1977) – £640.00

930

c. Recurring payments noted:
i. BT – Hall telephone & broadband (Local Government (Miscellaneous Provisions) Act 1976 s.19) – £47.94
ii. Bank charges (for the period 13/12/2021 – 12/01/2022) – £10.95
d. Payments received:
i. Bank loyalty payment – £0.45
Charges for burial fees and remuneration for the burial clerk will be reviewed in the next meeting.

7. Correspondence
a. A letter of thanks for the donation to Cylch Meithrin Tregaron had been received in August. A copy was shared.
b. Ceredigion County Council – Nomination Papers for the Town and Community Council Elections.
Cllr Emmanuel Kincaid will share the presentation of the meeting held on Wednesday, March 2nd by Zoom relating to the nomination papers for the Council Election. All Councillors wishing to stand for re-election must submit nomination forms.
Election timetable
• The Notice of election will be published on 18/03/2022
• Nominations will be accepted from 21/03/2022 until 4pm 05/04/2022
• Publication of Statement of persons nominated 6/04/2022
• Election date 5/05/2022
• Existing Cllrs retire 9/05/2022
• Newly elected Cllrs take office 9/05/2022
• Annual Meeting must be held by 23/05/2022
Nomination forms for Community Councillors can be downloaded (https://www.electoralcommission.org.uk/sites/default/files/2022-02/Nomination%20pack%20communities_1.doc )and submitted online or an appointment can be made, to submit in person and have forms verified, by phoning 01545 570881 or by e-mail to returningofficer@ceredigion.gov.uk
There is no longer a requirement to have a proposer and a seconder, candidates will only require a witness.
c. Independent Remuneration Panel for Wales Annual Report – February 2022
The contents of the report referring to Community Councils were noted.
IRPW Determination 44 (2022-2023):
Community and town councils must make available a payment to each of their members of £150 per year as a contribution to costs and expenses, with the exception of those councils in Group 5 (size of electorate under 1000) where the payment is optional.

931

Councillors were reminded that in accordance with para 13.8 of the Independent Remuneration Panel Wales annual report 2021/2022, they would need to give notice in writing to the clerk/ RFO if they did not wish to receive the mandatory basic payment of £150 to members of the Community Council for the financial year 2021/2022.
In accordance with determination 44 above, the basic payment will be optional for Llanddewi Brefi Community Council in 2022-2023.

8. AOB.
a. The Hall electrical system tripped on Wednesday evening during use of the cooker. A full inspection of the hall and community centre electrical installation is due.
b. The Broadband hub should not be moved. Leaving it face down won’t allow remote access to the heating system. If the broadband connection fails, the heating can be advanced for 2 hours if the button on the programmer is held down for 3 seconds. The same applies for the hot water button, but this will only operate for 1 hour when pressed for 3 seconds.
c. Cllr Rhodri Evans had attended the opening of the new Cylch Meithrin building on the Ysgol Henry Richard site. It was mentioned that the library might benefit from a Welsh Books Council donation if asked.
d. It was suggested to hold a combined clean-up of the cemetery and Memorial Inspection on 28 March at 7pm following a complaint about broken glass and broken glass covered wreaths. The wording for the poster to draw attention to the above has been agreed and should be displayed over Palm Sunday when families visit the graves.
e. The posts either end of the Pynfarch path (leat) linking Ash Street and the main road need repair. This matter to be considered at the next meeting.
f. The hall is due a fire extinguisher inspection. An extra fire extinguisher will be purchased on the day.
g. An enquiry has been received regarding hire of the hall for a party needing a licenced bar in August. More information to be requested. Hire guidelines and agreement are in place and available online.
h. A card was received from Maureen, former Clerk, thanking the Councillors for the evening and gift received on her retirement and thanking everyone for their support over the years.
9. Date of next meeting.
A special meeting will be held at the cemetery on 28th March 2022, followed by a meeting at the community centre.

Minutes – Llanddewi Brefi Community Council – 24/02/2022

PDF Download PDF

924

Minutes of the meeting held on Thursday 24th February 2022 at 7:30pm on Zoom.

Draft minutes are published in accordance with the requirements of the Local Government and Elections (Wales) Act 2021, and are subject to approval at the next ordinary meeting of the Community Council.

Present:
Councillors: Eirwen James (Chair), Caryl Jones (vice chair), Emmanuel Kincaid, Lynet Pugh, Dafydd Lloyd Jones, Rhodri Evans, Pat Parry, Enfys Hatcher Davies, Beth Anthony, John Lloyd Griffiths.

1. Apologies
None.
2. Declarations of interest
None
3. Review of feedback regarding project eligibility, following initial discussions with the Cynnal y Cardi LEADER Grant team.
The Cynnal y Cardi Team has provided further feedback on the ‘Cynnal Llanddewi Brefi’ LEADER grant application.
The initial feedback identified alternative funding sources for some of the community suggestions, from grant streams such as Arts Wales, Cered etc. Some other items fell into the category of Capital works and so were ineligible. Others suggestions were considered to be partly eligible, but all needed to evidence collaboration and community cohesion, and demonstrate innovation.

It was suggested that the Nature Reserve Group’s proposal for a Wildlife Garden/ Orchard could be developed and siting identified in collaboration and consultation with other user groups as part of the ‘Jiwbili Llanddewi Brefi’ project, as the Hall Committee has been successful with the Lottery Platinum Jubilee Grant. Proposals and plans will need to be developed to see how this integrates with the project.

The application for new digital technology with video conferencing and display system has been developed to include an interactive whiteboard screen with integrated computer, and a video camera mast system with the capability for live streaming.

Training and volunteer contributions have also been included; one member from each representative group will be trained to use the digital facility, and provide support to their group during the project.

925

The project also includes a pilot scheme for Youth Access to the hall facilities, including Snooker, Pool and Table Tennis. Volunteers will provide supervision for weekly sessions over the 6 months of the project. It was agreed that there should be a discounted rate offered for the Hall hire, to include the main hall space, on Friday evenings. DBS checks will be required for volunteers; this should be free of charge but will need to be specific to this activity.

Letters of support for the project have been received from village groups and hall users expressing their support for the ‘Cynnal Llanddewi Brefi’ Leader project.

Several drafts of the application form and project costs, outputs, and pilot activities were reviewed; 3 quotes had been provided for all items over £5k.
Project costs:
RDP Grant £9,000.00
In Kind Contribution Hall hire £500.00
Volunteer time Training and Youth Access supervision £3,309.75
Cash Contribution £97.35
Total project cost: £12,907.10

It was noted that Grant payment will be on the basis of defrayed expenditure by the Community Council – the initial equipment purchase and training cost totalling £9,097.35.

4. Review and approve submission of the Cynnal y Cardi LEADER Grant application.
The closing date for applications was noted as Monday 28 February.
If successful, the funding would need to be spent between April 2022 and September 2022, with final reporting due to be returned by 30 November 2022.
The content of the application form was agreed by all present, and the Council authorised the Chair to sign the declaration and accept the conditions of grant.

Members were thanked for their contributions to the Cynnal Llanddewi Brefi Grant application, which is being submitted as a result of a meeting of Hall users convened at the Community Centre on 9 February 2022.
Cllr Rhodri Evans was asked to thank the Cynnal y Cardi Team for their support.
5. AOB.
Councillors were informed by Cllr Rhodri Evans that CAVO is still willing to accept applications for the Ceredigion Small Grants. Some progress has been made with the application, and costs have been established for a keyboard/piano/organ for use in the Hall.
6. Date of next meeting.
A special meeting will be held on 3rd March 2022.

Minutes – Llanddewi Brefi Community Council – 14/02/2022

PDF Download PDF

916

Minutes of the meeting held on Monday 14th February 2022 at 7pm in the Community Centre.
Draft minutes are published in accordance with the requirements of the Local Government and Elections (Wales) Act 2021, and are subject to approval at the next ordinary meeting of the Community Council.

Present:
Councillors: Eirwen James (Chair), Caryl Jones (vice chair), Emmanuel Kincaid, Lynet Pugh, Dafydd Lloyd Jones, Rhodri Evans, Pat Parry, Enfys Hatcher Davies, Beth Anthony.

1. Apologies
Apologies were received from Cllr. John Griffiths.
2. Personal Matters
Councillors expressed their gratitude to Edwards Building Services for volunteering to clean gutters at the community centre, and to Councillors and residents for helping to clean the grounds on 12/02/2022. A great effort was made by everyone.
3. Declarations of interest
Lynet Pugh – Item 9 – declared interest.
4. Cambrian Mountains Society – presentation of proposal for AONB designation
A presentation was given by Lorna Brazell, on behalf of the Cambrian Mountains Society (CMS).
Emphasised that the ‘Cambrian Mountain Initiative’ is a separate entity that promotes development in uplands of Pumlumon, Elenydd, Mallaen and Llanllwni/ Brechhfa.
CMS are seeking designation as an AONB, not a National Park; looking to balance interests of agriculture, forestry and other rural industry with economic and social needs of communities. AONB would be managed by a partnership which would include Ceredigion, Powys and Carmarthen County Councils, NRW, land owners and managers, local communities, farming unions and charities – RSPB and National Trust, ensuring local accountability and specialist expertise. The management plan would be reviewed every 5 years, and would provide an area branding for the region’s products and services.
Costs would be shared between national and local government on a statutory basis; AONB partnerships can also access additional funds for projects e.g. Heritage Lottery Fund Landscape Partnership programme.
AONB would give greater influence over management of the area and its infrastructure.
AONB designation needs to demonstrate support from local communities; CMS are seeking a statement of support in principle, and input from the community – does it see value in AONB status, and what would it want to see delivered?

917

5. Consultation on the proposed tree planting scheme at Brynglas by Tilhill Forestry.
Arwel Davies, Tilhill Forest Manager, Ben Lake MP, and Nathaniel James, representing the West Wales Rivers Trust (WWRT), were also present during the discussion.
AD explained that the Foresight group, private equity investment managers focussed on renewable energy and sustainable forestry, have recently purchased land at Brynglas, Frongoch, and Esgair Hir with a view to afforestation supported by grants from Welsh Government’s Glastir Woodland Creation Scheme.
Of the 250ha at Brynglas, almost half is in a SSSI designated area and under 124ha is available for planting. The current proposal is for 97ha blanket planting. Discussions with NRW are ongoing regarding habitat constraints and the deadline for submission of a final draft for screening assessment is 25th February.
The Community Council have twice requested a copy of the Environmental Impact Assessment report submitted to NRW, but to date have only received a copy of the response letter dated 8th October 2021 referring to the initial planting plan, which proposed only 7% mixed broadleaf and encroached on potential endangered species habitat and areas of deep peat. It was noted that the revised planting scheme avoids these areas, and increases the proportion of broadleaf species to 25%.
Prior to the meeting, a briefing document had been circulated to members and attendees, based on the revised planting map, stating that according to the Welsh Government Woodland Opportunity Map 2021 (WOM21), the proposed planting site appears to have a very low ‘woodland creation’ score based on data layers of ecosystem services or benefits arising from new woodland creation. Upland areas appear to be the least favoured under the scheme, and out of a potential 38 points, the overall score at the centre of the planting area is 2. Up to 28% of the proposed planting area lies within the buffer zones to the SSSI and Special Landscape area buffer zones, and outside the opportunities map area.
The whole of the site is in an ‘acid sensitive’ catchment area, and a large proportion is shown as “priority habitat – upland heathland”. Although noted as potentially plantable on WOM21, this is qualified by the statement that “Priority Habitat that is not upland acid grassland/upland marshy grassland must remain unplanted within these mosaic areas.” As it is designated “upland heathland” this suggests that it should remain unplanted.
It was noted by one attendee that the proposed planting area is within a sensitive catchment for both Pysgotwr streams/rivers, Doethie and Camddwr, which are Salmon and Sewin feeder streams. In response to concerns regarding increased water runoff as a result of ploughing, AD confirmed that a mounding planting process would be used, which would not create furrows.

918

Ben Lake raised the following concerns:
a. It is acknowledged that Natural Resources Wales (NRW) stated in its letter dated 8 October 2021 that the proposal did not require consent under the Environmental Impact Assessment (Forestry)(England and Wales) Regulations 1999, but would appreciate confirmation that this was on the basis of the applicant’s environmental impact assessment, and not an assessment undertaken by NRW itself.
i. If the former is confirmed, what consideration has been given to whether the application needed a Habitats Regulation Assessment under the Conservation of Habitats and Species Regulations 2017?
ii. NRW includes in its letter dated 8 October 2021 a provision that if “habitats or soils unsuitable for planting [or] that require protection are found these will be mapped out and left as open ground.” Clarification is sought as to who is responsible for determining whether a habitat or soil should be left as open ground, and subsequently who will monitor adherence to the same.
b. It would be useful to understand Tilhill’s management plan for the plantation, and in particular:
i. Their proposed planting plan. It was suggested that the entire area would be planted in one phase.
ii. How they propose to mitigate the risk of seeding from the coniferous trees, and ensure the integrity of the broadleaf sections of the plantation plan.
iii. Confirmation that the plan is for a continuous cover forestry, and details of how they intend to thin the forestry over the first 15 years.
c. It is understood that the owners of the proposed plantation, Foresight Group, intend to issue shares from the profits gained from it. It would be useful to understand how these profits will be generated, and clarification of intended end use of any timber felled.
Nathaniel James raised the following issues and concerns on behalf of WWRT:
d. Impact of afforestation on rivers and their biodiversity;
i. Acidity – base soil & geology
ii. Water Cycle – preventing precipitation reaching the ground in summer
iii. Temperatures – effect on winter & summer climate
iv. Further degradation –in addition to current pressures & issues
v. Cumulative impact – lessons learnt from poultry farming, Development, Dairy, etc.

919

e. In any future development of planting plans, WWRT would like to see;
i. A larger proportion of broadleaf species
ii. Wider buffer
iii. Commitment to independent monitoring, riparian maintenance, removal of self-seeds & remedial measures if any of the monitored parameters fail standards set.
iv. Monitoring of;
• pH levels
• Fish, Bird & Invertebrate populations
• Soil loss
• Stream temperatures
• Flow rates.
v. Willingness to support wider catchment restoration in the catchments they operate in.
f. WWRT stressed that there is weak evidence of acidified streams recovering, even with reduced atmospheric emissions, as stated in “Managing Forests in Acid Sensitive Water Catchments – A Forestry Service Practical Guide”, with the consequences stretching across the entire Tywi & Teifi catchments & Welsh communities and businesses.
AD explained that buffers are promised to reduce seeding – management of this would be self-monitored by Tilhill but checked by Welsh Government. AD also mentioned that increasing the proportion of broadleaf species might be considered – this would be welcomed by all representatives.
The issue of access to the site for planting and future harvesting was raised, with concerns regarding the inadequate road infrastructure and impact of heavy traffic on the community, and queries as to how this would be mitigated. AD confirmed that access will be by the existing road network, and that bridge improvements may be required.
As the proposed woodland is to be supported by Glastir funding, questions were raised as to the sustainability of the project, since the future of Glastir is unsure.
AD explained that timber production is intended primarily for construction purposes, and that this supports long term retention of deciduous trees. In response to queries, AD confirmed that 60-70% of production from local managed woodland is construction grade timber for man-made boards (OSB etc.), the remainder being used for fencing and biomass. The intention is to employ locally based companies for planting and harvesting.

920

As the consultation deadline was confirmed by AD as 18th February, it was agreed that the draft minutes for this agenda item would be submitted as a formal response.

6. To confirm temporary arrangements for the carrying out of the duties of the Clerk as Proper Officer and Responsible Financial Officer.
Resolved that Cllrs Rhodri Evans and Emmanuel Kincaid should continue in their current roles as Proper Officer and Responsible Financial Officer respectively, until 30/04/2022.
7. To confirm the minutes of the meeting held on 17 January 2022.
On the proposition of Cllr. Dafydd Lloyd Jones and seconded by Cllr. Pat Parry the Council authorised the Chair to sign the minutes of the Community Council meeting held on the 17th January 2022.
8. Matters arising from the minutes.
The footpath warden has carried out an inspection and the issue with Cysgod y Llan has been resolved.
The large tree in Tan yr Allt is to be cleared next week.
9. To consider a proposal for donation to Gogerddan Hunt
On the proposition of Cllr. Dafydd Lloyd Jones and seconded by Cllr. Caryl Haf Jones the Council resolved to support the hunt with a donation of £80.
10. Financial report
a. The bank reconciliation report for the period ending 31 January 2022 was presented by the RFO, approved by members, and signed by the Chair.

Bank balances at 18/01/2022:
Current A/c £250.00
Reserve A/c £1,611.69
Reserve A/c £10,872.54
An overpayment of reimbursement to one member was noted; due to the bank’s error in processing/ updating the signing mandate, the RFO was informed that cheque nr 101111 in the amount of £86.40 would be returned, however, on preparing the bank reconciliation it was noted as paid, and therefore a duplicate payment by cheque 101116 had been incorrectly made. Agreed that the overpaid amount of £86.40 would be deducted from the reimbursement to the same member for item b(ii) below.
b. The following payments were authorised:
i. Zoom – reimbursement of payments 06/12/2021-06/02/2022 (Local Government Act 1972, s.111) – £43.17
ii. Reimbursement of payments for heating programmer, ‘Keysafe’, skatepark repair screws, and goal pegs, for the Community Centre

921

(Local Government (Miscellaneous Provisions) Act 1976 s.19) – £252.92. Less overpayment noted above – £86.40. Balance to be reimbursed – £166.52.
iii. Donations – Gogerddan Hunt (Local Government Act 2000, s.2) – £80.00
c. Recurring payments noted:
i. BT – Hall telephone & broadband (Local Government (Miscellaneous Provisions) Act 1976 s.19) – £47.94
ii. Bank charges (for the period 15/11/2021 – 12/12/2021) – £14.55
d. Payments received:
i. Bank loyalty payment – £0.99
It was agreed that professional advice would be sought regarding reclaiming VAT on purchases made by members on behalf of the Council.
The possibility of applying for a payment card will be included on the agenda for the next meeting.
11. Terms of engagement and responsibilities of the Internal Auditor.
The Council reviewed the Audit Wales certificate and report for the year ending March 2020 and, in accordance with its recommendations, agreed that a draft Internal Auditor engagement letter would be issued for approval with the agenda for the next meeting.
12. To consider applying for funding from the Cynnal Y Cardi LEADER Grant Scheme and CAVO Small Grants
Cynnal y Cardi Leader grant:
Cllr Rhodri Evans shared feedback from the Cynnal y Cardi Leader grant team regarding eligible projects and advice on other grants that could support some of the suggestions that were ineligible under this particular scheme.
After discussing all eligible suggestions from the community meeting, Council resolved to apply for a grant for new digital technology with video conferencing camera/ microphone/ speaker and display system to provide a standalone touchscreen computing/ hybrid meeting facility for local organisations to use in the hall. The application would also include a portable waterproof wide-angle video camera for groups to use for mentoring, training and recording content for meetings and presentations.
13. Correspondence (copies forwarded to members).
a. Belltown Power – Request for meeting regarding the emerging proposal for the Waun Maenllwyd Wind Farm
A zoom meeting was suggested to discuss proposals on 3rd March at 7pm.
b. A Briefing Session will be held for prospective Town / Community Council candidates on Wednesday, 2nd March 2022 at 6.00pm over Zoom.

922

c. Invitation to contribute stories about developments, successes or meetings as a Community Council on Caron360, and to the Bro360 webinar, to be hosted by Bro360 on Zoom in March
d. Cambrian Mountains Newsletter
e. Royal British Legion – information regarding the Queen’s Green Canopy project; a tree planting initiative created to mark Her Majesty’s Platinum Jubilee in 2022.
f. Play Sufficiency Assessment 2022 for Ceredigion – questionnaire
g. Hywel Dda Community Health Council newsletter
h. Invitation to attend the Cylch Meithrin Tregaron AGM on 28/02/2022 at 7pm in the new building at Ysgol Henry Richard.
i. Wales Air Ambulance 2021/22 Community Grant Appeal
14. Report regarding inaccuracies in the transcription of local information from the 1921 census on the ‘Find my Past’ website.
Failures of ‘Find my Past’ were reported in relation to digitising the 1921 census. Spelling of Welsh holdings are inaccurate and unrecognisable and dwellings recorded in the wrong parishes/parcels. Findmypast note on their website that transcription errors can be reported without purchasing the transcript by emailing transcriptsupport@findmypast.com. Error reports should include a link to the record and a brief description of the error, and use “1921 Census transcription update” as the email subject line.
15. Renewing member photos on the website
All council members were asked to provide a passport sized photo for the website.
16. Report from the PCSO
A request was made that the PCSO should attend our next meeting.
17. Report regarding damaged road signage
Councillors reviewed photographs of damage to signs in several locations – Cllr Rhodri Evans will discuss repairs or replacements with Highways.
18. County Councillor’s report on matters arising from Ceredigion
19. Planning applications
a. To note the following approvals:
i. A211053 – Peter’s Field, Llanddewi Brefi; temporary siting of a caravan for habitation whilst building a dwelling –Approved Subject to Conditions

923

ii. A210950 – Land adj. to Bethlehem Chapel; temporary siting of a caravan for habitation whilst building a dwelling – Approved Subject to Conditions

20. Report from the Village Hall and Recreation Grounds Committee.
21. Ysgol Henry Richard.
22. AOB.
a. Bins have been collected from Pont Llanio after being missed last week.
b. 100 Club will be drawn in May.
23. Date of next meeting.
A special meeting will be held on 3rd March 2022, subject to confirmation by Belltown Power. The next ordinary meeting will be held on the 14th March 2022.

Agenda – Llanddewi Brefi Community Council – 28/03/2022

PDF Download PDF

A meeting of the Community Council will be held on Monday 28th March 2022 at 7:00pm at the Cemetery and at 7:45pm in the Community Centre.

Members of the public wishing to attend remotely should email web@llanddewibrefi.org in advance to request a link to the meeting.

AGENDA

  1. To receive apologies.
  2. Personal Matters
  3. Declarations of interest.
  4. To confirm the minutes of the meetings held on 14 February, 24 February, and 3 March 2022.
  5. Matters arising from the minutes.
  6. To confirm the appointment of the Internal Auditor.
  7. To review and sign a contract for Cynnal y Cardi LEADER Grant 
  8. Financial report.
    1. To approve the bank reconciliation for the period ending 28 March 2022. 
    2. Authorisation of payments.
      1. Reimbursement of expenses – Stationery.
    3. Recurring payments.
      1. BT – Hall telephone & broadband 
    4. Payments received.
  9. Correspondence (copies forwarded to members).
    1. Audit Wales – Audit notice 2022
    2. Letter from Cylch yr Iaith
  10. To receive a report from the PCSO.
  11. County Councillor’s report on matters arising from Ceredigion 
  12. Planning applications
    1. To note the following approvals:
      1. A210837 – Erection of an agricultural building; Land North of Bronbyrfe
    2. To consider the following applications:
      1. A220085 – Installation of a 25m mast; Land at Garn Felen, Adjacent to Forestry Track Bryn Du, Tregaron.
  13. To receive a report from the Village Hall and Recreation Grounds committee.
  14. A.O.B.
  15. Date of next meeting. 

Agenda – Llanddewi Brefi Community Council – 03/03/2022

 

PDF Download PDF

A meeting of the Community Council will be held on Monday 3rd March 2022 at 7:00pm on Zoom.

Members of the public wishing to attend remotely should email web@llanddewibrefi.org in advance to request a link to the meeting.

AGENDA

  1. To receive apologies.
  2. Declarations of interest.
  3. Belltown Power – presentation of proposal for the Waun Maenllwyd Wind Farm
  4. To review and approve submission of the CAVO Small Grants
  5. To approve terms of engagement and responsibilities of the Internal Auditor.
  6. Financial report
    1. To approve the bank reconciliation for the period ending 28 February 2022.
    2. Authorisation of payments.
      1. Purchase of fire alarms and signage for the Community Centre.
    3. Recurring payments.
      1. BT – Hall telephone & broadband
    4. Payments received.
  7. Correspondence
    1. Letter of thanks from Cylch Meithrin Tregaron
    2. Ceredigion County Council – Nomination Papers for the Town and Community Council Elections
    3. Independent Remuneration Panel for Wales Annual Report – February 2022
  8. A.O.B.
  9. Date of next meeting.

Agenda – Llanddewi Brefi Community Council – 24/02/2022

PDF Download PDF

A meeting of the Community Council will be held on Thursday 24th February 2022 at 7:30pm on Zoom.

Members of the public wishing to attend remotely should email web@llanddewibrefi.org in advance to request a link to the meeting.

AGENDA

  1. To receive apologies
  2. Declarations of interest
  3. To review feedback regarding project eligibility, following initial discussions with the Cynnal y Cardi LEADER Grant team.
  4. To review and approve submission of the Cynnal y Cardi LEADER Grant application.
  5. A.O.B.
  6. Date of next meeting.